Rail Joins at Lifting Sections Rick Fletcher - NSW Australia |
This the latex carpet adhesive used to hold all the track, points and underlay in place. Preparing the join on the entry lift-up-flap.![]() |
The track has weights added until the latex cement sets. Note the plywood pieces to align the rail joins. |
![]() |
3 sleepers were removed and PCB replacements soldered in place. The middle of the sleepers sanded away to insulate both sides. The track is code 75. |
![]() |
When the glue had set, the join line was cut with a razor saw. Slow and tedious. The latex was not up to the job on these sleepers and I now use epoxy. |
![]() |